My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-02-28_REVISION - C1994082 (6)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1994082
>
2011-02-28_REVISION - C1994082 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:31:18 PM
Creation date
2/28/2011 10:09:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
REVISION
Doc Date
2/28/2011
Doc Name
Phase II Bond Release Application
From
Seneca Coal Company
To
DRMS
Type & Sequence
SL3
Email Name
SLB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Yoast Mine SL-3 February 2011 <br />Phase ll Bond Release Request <br />• All west of the 6th Principal Meridian; totaling 2,318.3 acres. The location of the bond <br />release area is shown on ExhibitA -Phase HBond Request Area. <br />• Permit Numbers and Reclamation Bonds <br />Permit #: C-1994-082 <br />Issued: August 5, 1995 <br />Renewals: 3/6/2001 <br />8/2/2005 <br />12/15/10 <br />The reclamation bond in effect at the Yoast Mine is a self-bond SB-005 in the amount of <br />$4,305,484. <br />• Map (Exhibit) Descriptions <br />Exhibit A, Phase H (SL-3) Bond Release. This exhibit shows the areas for which Phase II <br />bond release is requested. <br />Exhibit B, Chronological Revegetation. This exhibit presents the chronologic progression <br />• of revegetation within the Phase II Bond Release area. Everything requested has been <br />released from Phase I liability and has also been revegetated for at least two (2) years. <br />Exhibit C, Topsoil Sample Map. This exhibit indicates the locations of the topsoil sampling <br />effort within the overall disturbance area. <br />II. PHASE II BOND RELEASE DOCUMENTATION <br />This application represents the formal request for Phase II Bond Release at the Yoast Mine of <br />628.6 acres of reclaimed area that complies with applicable revegetation success criteria set <br />forth in Rule 4.15.8. Exhibit A, Phase H Bond Request Area, shows the location of the <br />628.6 acres included in this request. <br />The amount of bond requested for Phase II release is $2,154,845. The rationale for this <br />request is documented in Attachment H, Bond Release Calculation. <br />• Summary of Reclamation and Management History <br />Reclamation (i.e., topsoil replacement, revegetation, monitoring and maintenance) was begun <br />in 2001 and continued through 2010. This activity is documented in the Annual Reclamation <br />Reports. The only areas requested are those revegetated for two (2) years or more. <br />Reclamation management is a continuing effort that includes: <br />----------------------------------------------------------------------------------------- <br />2
The URL can be used to link to this page
Your browser does not support the video tag.