Laserfiche WebLink
Introduction <br />The information assembled in this 2010 Annual Hydrology Report (AHR) <br />includes data collected from approved monitoring sites established at <br />the Peabody Sage Creek Mine (PSCM), State Permit No. C-2009-087. <br />Locations of monitoring sites associated with the PSCM can be found by <br />referring to Map 2.04.7-M1, Hydrology, which may be found in Volume 4A <br />the PSCM Permit Application Package (PAP). Locations of monitoring sites <br />associated with the Seneca II Mine can be found by referring to Exhibit <br />7-2, Hydrology Monitoring Site Location Map, which may be found in the <br />Seneca II Permit Application Package (PAP). In addition, NPDES ponds, <br />surface water sites, monitor wells and spoil springs are located in <br />Figure 1, Appendix A. A general location map of Seneca Coal Company <br />sites may be found in Figure 2. All references to 2010, or to "this <br />year", will be for Water Year 2010 (October 1, 2009 through September <br />30, 2010) unless otherwise noted. All tables referred to in the <br />following text can be found in Appendix A. In addition, a table of <br />• contents for Appendix A is given at the beginning of that appendix. <br />This is the first AHR for the PSCM. The mining permit for the PSCM was <br />approved by the CDRMS in May 2010. No mining activities have occurred at <br />the PSCM as of January 2011. A large portion of the reclaimed Seneca II <br />Mine (State Permit No. C-80-005) exists in the PSCM permit area. The <br />last of the coal at the Seneca II Mine was removed in August 1999. Many <br />of the hydrology monitoring sites used by the Seneca II Mine continue to <br />be used for the PSCM. Therefore, when discussing historic data, the <br />Seneca II Mine (or, Seneca) name will be used. PSCM will be used when <br />discussing current data. There was some overlap of the two monitoring <br />programs this year. This AHR will discuss monitoring sites in use by <br />both the PSCM and the old Seneca II Mine hydrology program. Sites that <br />are specific to the new (approved December 2010) Seneca II Mine program <br />will be discussed in that AHR. Those include all sites in the NPDES Pond <br />008 basin, as well as the sites on Fish Creek. <br />. Field conductivity and pH meters are calibrated prior to each day's use. <br />The conductivity meter is calibrated using a potassium chloride solution <br />1