My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-02-25_REPORT - C1982057
DRMS
>
Day Forward
>
Report
>
Coal
>
C1982057
>
2011-02-25_REPORT - C1982057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:31:13 PM
Creation date
2/25/2011 2:31:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
Report
Doc Date
2/25/2011
Doc Name
2010 Annual Hydrology Report
From
Seneca Coal Company
To
DRMS
Annual Report Year
2010
Permit Index Doc Type
Hydrology Report
Email Name
SLB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2010 0.196 cfs (monthly measurements) <br />2009 0.215 cfs (monthly measurements) <br />2008 0.446 cfs (monthly measurements) <br />2007 0.164 cfs (monthly measurements) <br />2006 0.185 cfs (monthly measurements) <br />2005 0.117 cfs (monthly measurements) <br />2004 0.509 cfs (monthly measurements) <br />2003 0.198 cfs (monthly measurements) <br />2002 0.186 cfs <br />2001 0.080 cfs <br />2000 0.099 cfs (from monthly measurements as of 12/99) <br />1999 0.184 cfs (weekly measurements) <br />1998 0.317 cfs <br />1997 0.343 cfs It <br />1996 0.144 cfs <br />1995 0.106 cfs 99 <br />1994 0.010 cfs it <br />1993 0.127 cfs • <br />1992 0.036 cfs IT <br />1991 0.062 cfs it <br />1990 0.055 cfs (pond did not completely fill until March <br /> 29, 1990). <br />This year's average flow value is 20% above the historic average flow <br />value, 0.163 cfs. The timing of when flow values are collected affects <br />these averages. <br />Flow values for this pond have been affected by a 3.4 foot increase in <br />spillway elevation on July 31, 1991, the installation of a 4 inch <br />orifice on the riser pipe on November 2, 1995, and the dredging of this <br />pond that occurred in the summer of 1996 and the fall of 1997. An <br />upstream presettling pond was added in March 1998. The principle <br />spillway elevation was changed again, and the dewatering orifice <br />removed, in August 1998. In August 2003, an 18-inch riser pipe was <br />installed on the discharge culvert, and the presettling pond was <br />removed. Additional dredging (and dewatering) occurred in the fall of <br />14
The URL can be used to link to this page
Your browser does not support the video tag.