My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-02-25_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2011-02-25_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:31:14 PM
Creation date
2/25/2011 1:29:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
REVISION
Doc Date
2/25/2011
Doc Name
Preliminary Adequacy Review Letter
From
DRMS
To
Colowyo Coal Company
Type & Sequence
PR3
Email Name
JHB
DIH
KAG
RDZ
TAK
MLT
SGR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colowyo, C1981-019, PR3 adequacy 12 February 25, 2011 <br />environmental monitoring system is required on all alluvial valley floors through Phase III <br />bond release. <br />7. At this point, the Division does not have adequate information to make a determination on the <br />presence or absence of AVF's. Once the questions above are adequately addressed, we will <br />make a determination as required by Rule 2.06.8(3)(c). Additional information may be needed <br />if we make a positive determination that an AVF does exist downstream in Collom Gulch. <br />Rule 4.05.2 Water Ouality Standards <br />The Division reviewed the demonstration for ring ditches around topsoil piles in Exhibit 7, <br />Item 23. The design includes the use of small, incised impoundments in combination with the <br />ring ditches. Exhibit 7-23D Figure 1 shows the incised impoundments and labels them with the <br />annotation "small impoundment incised per design in XXXXX." Please provide the design for <br />these small impoundments. <br />2. For any small disturbed areas as defined by Rule 1.04 (commonly referred to as SAE'S) that <br />will not report to sediment ponds, please provide a demonstration that the applicable effluent <br />limits can be met using alternative sediment control methods. This can include topsoil piles <br />and areas where it is impractical to divert runoff using diversion ditches. Numerous, small <br />disturbed areas currently appear outside of sediment containment on Map 41B. If these areas <br />are planned to be outside of containment ditches, they will need to be SAE's. <br />Rule 4.05.3 Diversions and Conveyances of Less than One Square Mile <br />For the reasons described under Rule 2.05.3(4) above, the adequacy of the information required by <br />this Rule cannot be determined at this time. <br />Rule 4.05.4 Stream Channel Diversions/Relocations <br />For the reasons described under Rule 2.05.3(4) above, the adequacy of the information required by <br />this Rule cannot be determined at this time. <br />Rule 4.05.5 Sediment Control Measures <br />For the reasons described under Rule 2.05.3(4) above, the adequacy of the information required by <br />this Rule cannot be determined at this time.
The URL can be used to link to this page
Your browser does not support the video tag.