My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-02-18_REVISION - P2008046
DRMS
>
Day Forward
>
Revision
>
Prospect
>
P2008046
>
2011-02-18_REVISION - P2008046
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:32:33 AM
Creation date
2/25/2011 1:18:06 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2008046
IBM Index Class Name
REVISION
Doc Date
2/18/2011
Doc Name
NOI MD approval (MD-05)
From
DRMS
To
American Shale Oil, LLC
Type & Sequence
MD5
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />CIRCES Cost EstimatinaSoftware <br />DEMOLITION WORK <br />PROJECT IDENTIFICATION Agency or organization name: DRMS <br />Task # : 02a State : Colorado Permit/job# : P-2008-046 <br />Date : 15-Feb-2011 County : Rio Blanco Abbreviation :none <br />User : THM Site :Amso Filename : P046-02a <br />Permitting action : Final Reclamation Cost Update - MD-05 <br />Task description : Demo. and removal of gates, culverts, powerlines, process equuip. and structures <br />UNIT COSTS Last unit cost update : January 2011 Location adjustment : 100.20% <br />STRUCTURE or ITEM DESCRIPTION DIMENSIONS DEMOLITION MENU SELECTION <br />-18"x 16' culvert 18"x 16' Pipe, CMP • 18 in. diam. <br /> <br />-Gate at entrance of well pads _ 157. x 5'H Gate removal <br /> <br />-Diesel Tank _ 8'H x 25'L Haul to cert. dump - 9K-12K gal. <br />-Drilling Fluid Tank 8'H x 20'L Haul to cert. dump - 9K-12K gaL <br />-Propane Tanks 4'H x 10'L Haul to cert. dump - 3K-5K gal. <br />-Incinerator _ 15'H x 10'L x 8'W Demo./disp./appr. dump - to 60 mi. <br />-Skids 8'W x 401 Demo./disp./appr. dump - to 60 mi. <br />-Process Building 40'W x 501 x 16'H Demo./disp./appr. dump - to 60 mi. <br />-Concrete Footers _ 211 CY Demo./disp. exs. pit V x 2'- 10K ft. <br />-Misc. tanks and piping Various sizes Load/5mi. haul, sivg. - Steel fr. <br /> <br />-Demo. 114 mi. 3-Phase Power Line 114 mi 3-Phase PL Tear Down QUANTITY <br />64.00 <br /> <br /> <br />4.00 <br />1.00 <br />1.00 <br />4.00 <br />1,200.00 <br />640.00 <br />32, 000.00 <br />150.00 <br />575.00 <br /> <br />1,320.00 UNIT <br /> <br /> <br />LF <br />csilgate <br />EA <br />EA <br />EA <br />CF <br />CF <br />CF <br />LF <br />CY <br /> <br />LF UNIT COST <br />$2.3 <br /> <br />357 <br />$100.0000 <br />$1.160.0000 <br />$1,160.0000 <br />$725.0000 <br />$1.1967 <br />$1.2609 <br />$1.2088 <br />$6.8332 <br />$7.8700 <br /> <br />$2.3900 TOTAL COST <br />$149 48 <br />. <br /> <br />$400.00 <br />$1,160.00 <br />$1,160.00 _ <br />$2,900.00 <br />$1,436.04 <br />$806.98 <br />$38,681.60 <br />$1.024.98 <br />S4,525.25 <br />_ <br />$3,154.80 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Ina rneT <br />--- - ° °°?°° °°? -0??•?yy I otal cost (adjusted for location): $55,510
The URL can be used to link to this page
Your browser does not support the video tag.