Laserfiche WebLink
<br />CIRCES Cost Estimatinq Software <br />EQUIPMENT MOBILIZATION / DEMOBILI? <br />PROJECT IDENTIFICATION <br />Agency or organization name :DRMS <br />Task # : 15a State : Colorado <br />Date : 0211512011 County: Rio Blanco <br />User: THM Site :Amso <br />sheet 1 of 2 <br />Permit/job # : P-2008-046 <br />Abbreviation :none <br />Filename :P046-15a <br />Permit or other job action :Final Reclamation Cost Estimate Md-05 <br />Task description :Mob/Demob <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br />Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />capaies pacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : ost/hour : $16.63 $18.37 $22.33 <br />= <br />st/hour : $44.38 $4 6.13 $50.07 <br />st/hour : $27.66 $27 27.66 <br />st/hour : $0.00 $25.39 29 <br />st/hour : $88.67 $117.55 $125.45 <br />NON-ROADABLE EQUIPMENT <br />Machine <br />Description Weight/unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />-Cat D7R DS Series 11 - 7SU 31.25 $43.55 $117.55 1 $161.10 $117.55 $250.00 <br /> <br />- evegetation Tractor <br />10.00 <br />$25.00 <br />$88.67 <br />1 <br />$113.67 <br />$88.67 ------- <br />$250.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $274.77 $206.22 $500.00