My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-02-25_REVISION - C1981019 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2011-02-25_REVISION - C1981019 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:31:14 PM
Creation date
2/25/2011 9:28:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
REVISION
Doc Date
2/25/2011
Doc Name
3rd Adequacy Letter
From
DRMS
To
Colowyo Coal Company
Type & Sequence
TR81
Email Name
JRS
JHB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. Response Accepted. Colowyo addressed the Divisions questions a-c on Map 20B with <br />their 1 June 2010 responses.. <br />8. Map 45 - South Taylor Fill <br />a. Response Accepted - Colowyo 1 June 2010 Responses. <br />b. Response Accepted - Colowyo 1 June 2010 Responses. <br />c. Response Accepted. Colowyo has added the zones of anticipated and completed <br />highwall mining to Map 45. <br />d. Response Accepted - Colowyo 1 June 2010 Responses. <br />e. Response Accepted - Colowyo 1 June 2010 Responses. <br />Rule 3.02.2 - Determination of Bond Amount <br />9. The Division now believes that the TR-81 plan for the South Taylor Pit is a viable <br />mining and reclamation plan. There are a few adequacy concerns that remain but <br />they will not affect the overall plan. Colowyo will need to provide a reclamation cost <br />estimate that addresses the changes to the mining and reclamation plans (including <br />the changes to the permanent fills, temporary fills and mining limits) contained in <br />TR-81. Colowyo has previously submitted a reclamation cost estimate as TR-85, <br />which remains incomplete. The correct way to address changes to the reclamation <br />cost estimate is to incorporate those changes into the revision where the changes <br />occurred. Colowyo will need to submit the changes to the reclamation cost estimate <br />as a part of TR-81. At that time, Colowyo can withdraw TR-85. <br />Rule 4.05.4 - Stream Channel Reconstruction <br />10. Response Accepted - Colowyo 1 June 2010 Responses. <br />11. Response Accepted - Colowyo 1 June 2010 Responses. <br />12. Response Partially Accepted. Please add the flow direction arrows to the terrace <br />benches on Map 41A as per the map legend. <br />Rule 4.05.6 - Sediment Ponds <br />13. Response Accepted. Colowyo has changed the footer as requested. <br />14. Response Accepted. Colowyo has provided the requested discussion of the West Taylor <br />Pond. <br />15. Response Accepted. Colowyo has updated Table 4 and the sediment loading information <br />as requested. <br />Rule 4.09.2 - Excess Spoil <br />
The URL can be used to link to this page
Your browser does not support the video tag.