Laserfiche WebLink
Climax Mine <br />Biosolids Reporting 2010 <br />Habitat Management, Inc. <br />S- <br />Very little composted biosolids were placed for reclamation at the Climax Mine in 2009, instead <br />the approximately 5,500 cy of composted Class A biosolids were stockpiled for use in 2010. The <br />stockpiled biosolids along with new biosolids produced in 2010 were all placed in 2010 for <br />reclamation. A total of 34,554 cy of Class A composted biosolids were placed in 2010 along <br />with approximately 700 cy of Vail Class A biosolids (Table 1). <br />t7__ %A-9A <br />1$D1C l: D1VAViiuJ Vac. ?.rviv <br />Class A <br />Com ost Vail <br />400 100 50 <br />Location Label c /ac c /ac c /ac mg <br /> 5 10.88 Figure l <br />T3Dam 1 0.61 Figure 2 <br />Mc 7, 8, 9 <br />10 0.59 0.12 0.84 <br />2.26 Figure 1 <br />Figure.1 <br />Robinson Tailing Pond <br />Storke Yard 3,6 <br />13 0.86 <br />1.90 0:80 Figure 1 <br />Figure 3 ' . <br />Storke Yard 11,12 6.64 Figure 3 <br />Robinson Tailing Pond 2 71.52 Figure 1 <br />East Side Channel 4 3.63 Figure 1 <br />t Acres', r ^ 86:35, 0.42; -A CI-6 ?' - <br />1 CY',52 12 y``,708 <br />Biosolids were used for both new reclamation and maintenance in 2010 (Table 1, Figure 1, <br />Figure 2, and Figure 3). Several.areas on Robinson Tailing Pond that were. reclaimed in 2005 <br />and 2006 with only 50 cy/acre of composted biosolids have not been successful and were <br />determined to require additional reclamation. These areas received an additional 400 cy/acre of <br />composted biosolids and were re-ripped and re-seeded in 2010 (Figure 1.). Additionally, Vail <br />Class A biosolids were top-applied at 50 cy/acre to enhance previous reclamation on Robinson <br />Tailing Pond, East Side Channel, and the Storke Yard.