My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-02-23_REPORT - M1977493
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977493
>
2011-02-23_REPORT - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2019 10:30:29 AM
Creation date
2/24/2011 12:48:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REPORT
Doc Date
2/23/2011
Doc Name
Annual Fee/Report/Map
From
Climax Molybdenum Co.
To
DRMS
Permit Index Doc Type
Annual Fee/Report
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Annual Report - 2010 <br />Climax Mine Reclamation Activities <br />Permit No. M-77-493 <br />• Continued construction activities in the new mill building and associated processing <br />equipment. <br />• Re-build of the primary crusher. <br />• Re-model and upgrade of Open Pit Shop facilities <br />• Construction of Robinson Lake Pumphouse <br />• Continuation of sediment removal from Robinson Lake <br />• Construction of Reclaim Pipeline used for pumping water from Robinson Lake to the <br />Mill. <br />• Construction of Tailing Delivery Line to #3 Dam. <br />• Installation of #3 Dam underdrains <br />• Closure of Crusher Area Vent Raise shaft (currently permitted for disposal of asbestos <br />containing material). <br />• Begin preparing the Open Pit for mining activities. As part of this project, construction <br />and development activities for a haul road along Cerresco Ridge will be performed. <br />As part of the anticipated construction activities associated with the Reclaim Pipeline and <br />Cerresco Ridge haul road, Climax estimates that there will be approximately 29 acres of new <br />disturbance and approximately 19 acres of re-disturbance of lands that have been reclaimed. <br />New and re-disturbance areas associated with the Reclaim Pipeline will pertain to certain <br />segments of the pipeline and to staging and material storage areas that will be established along <br />the pipeline alignment. The new disturbance area associated with the Cerresco Ridge haul road <br />will pertain to placement of fill material on which a portion of the haul road will be located. <br />These newly and re-disturbed areas are indicated in Maps 1 through 3 in Attachment 5 <br />Page 3 of 3
The URL can be used to link to this page
Your browser does not support the video tag.