My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-02-22_REVISION - C1981019 (5)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2011-02-22_REVISION - C1981019 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:31:08 PM
Creation date
2/23/2011 8:29:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
REVISION
Doc Date
2/22/2011
Doc Name
Revised Materials for Application
From
Colowyo Coal Company
To
DRMS
Type & Sequence
SL5
Email Name
JHB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M Colowyo Coal Company <br />PNW• 5731 State Highway 13 <br />O Meeker, CO 81641 <br />? <br />Z <br />0-0. Mrs. Janet Binns <br />0 Environmental Protection Specialist <br />Colorado Division of Reclamation, Mining and Safety <br />Department of Natural Resources <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />February 21, 2011 <br />ID'S 7- Co' 7- P, <br />FEB40 2 26 11 <br />DivISIOn ul 1,-,d:nation, <br />Mining and Safety, <br />RE: Application for Phase III Bond Release on 1978-1999 Reclaimed Areas, <br />Colowyo Coal Company L.P. Permit No. C-1981-019, SL-05 <br />Dear Mrs. Binns, <br />Enclosed please find revised materials to Colowyo Coal Company's Phase III Bond <br />Release Application SL-05. Table 1 and Exhibit 1 have been revised to address Items 1 <br />and 4 in the Colorado Division of Reclamation Mining and Safety (CDRMS) August 24, <br />2010 inspection letter. <br />Specially, Colowyo is reducing the acreage requested for Phase III Bond release by 7.8 <br />acres, composed of 2.6 acres from Streeter Gulch Ditch, 2.1 acres from Gulch A Ditch, <br />and 3.1 acres from the Small Area Exemption associated with topsoil pile 15G in area <br />EP015. Table 1 provides the adjusted acres, and Exhibit 1 provides locations of each. <br />Other items identified in the August 24, 2010 inspection will be handled in a timely <br />manner as on the ground conditions improve in the Phase III lands this spring. Once <br />identified items have been successful completed Colowyo will notify the CDRMS in <br />writing. <br />Included with the revised materials for SL-05 is a change sheet to ease incorporation into <br />the SL-05 document. Please contact me directly at (970) 824-1532 if you have any <br />questions concerning this revised application for bond release. <br />Sincerely, <br />Tony Tennyson <br />Environmental Engineer <br />Encl. 2 copies <br />Cc: CF 24.1 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.