Laserfiche WebLink
<br />6 <br />Colorado Division of Minerals and Geology <br />Annual Reclamation Report for the Year 2010 <br />Foidel Creek <br />Mine Name <br />CO 82-056 <br />Permit # <br />Address: 29515 RCR27 Oak Creek, Colorado 80467 <br />Twentymile Coal, llc <br />Permittee <br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upon by the <br />Division. It should include text, discussion, and maps, at a minimum, in addition to any other reclamation monitoring data as <br />required by the approved permit. The location of the acreage reported under each land status category and year of seeding (if <br />applicable) should be clearly and accurately identified on a map included with the report. <br /> <br />Land Status Category Last Years <br />Cumulative Total <br />This Calendar Year <br />Cumulative Total t <br />Acres permitted to be disturbed 594.1 15.3 609.4 <br />Acres backfilled and graded 75.2 36.2 111.4 <br />Acres topsoiled 75.2 36.2 111.4 <br />2010 backfilled and graded includes 6MN Pipeline (7.1 acres), 18LT Pipeline (7.5 acres), 18RT Vent Shaft (18.8 acres), and <br />EMD Fan Site (2.8 acres) <br />Seeding typically begins the minimum 10-year reclamation liability period. Please report the acres for each category below. <br />Do not include acres that have achieved final, Phase III release. <br /> Last Years <br /> Cumulative This Calendar Cumulative 10 year121.3s or Greater than <br /> Total year Total 1 less 10 years' <br />Acres seeded* 92.2 36.2 128.4 0 <br />*Include, it necessary, a description of any augmented seeding or cultural practices <br />For the Entire Life of Mine, the total number of acres disturbed: 609.4 and the total number of acres: <br />Phase I released 0 <br />Phase II released 0 Phase III released 0 <br />For Mines in Permanent Cessation <br />Total acreage in facilities subject to reclamation but yet to be completed: N/A <br />For Government Performance and Results Act <br />Acreage in long-term mining or reclamation facilities. 498.0 (from 2010 ARR Disturbed Acreage - includes "Active" and <br />"Pending") <br />Acreage in active mining areas: N/A <br />Exclude acres where Phase Ill release has been achieved <br />Includes haul and access roads; temporary dams and impoundments: permanent dams and impoundments diversion and collector ditches, water and air <br />monitoring sites: topsoil stockpiles: overburden stockpiles; repair, storage and construction areas: office area, repair shops, and parking; coal stockpiles. <br />loading, and processing areas; railroads. coal conveyors; refuse piles and coal mine waste impoundments; head-of-hollow fills: valley fills: ventilation <br />shafts and entryways; and noncoal waste disposal area (garbage dumps and coal combustion by-products disposal areas). <br />3 Includes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and graded