My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-02-22_REVISION - C1991078
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1991078
>
2011-02-22_REVISION - C1991078
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:31:09 PM
Creation date
2/23/2011 8:16:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1991078
IBM Index Class Name
REVISION
Doc Date
2/22/2011
Doc Name
Cost Estimate (Memo)
From
Jim Stark
To
Marcia Talvitie
Type & Sequence
SL2
Email Name
MLT
JRS
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Date : 09-Feb-11 Permit: C-1991-078 Site: Hamilton Mine <br />User: JRS State : Colorado <br /> Filename: C078-000 County: Montrose <br />Agency Name: Colorado Division of Reclamation, Mining and Safety <br />Permit Action: Phase 11 Bond Release SL-02 <br /> <br />Task Task Description TASK HOURS DIRECT COST <br /> <br />010 Regrade Sediment Pond A Access Road Released - SL-02 $0 <br />Oil Regrade Sediment Pond B Access Road Released - SL-02 $0 <br />016 Regrade Sediment Pond A Released - SL-02 $0 <br />017 Regrade Sediment Pond B Released - SL-02 $0 <br />021 Regrade Collection Ditches Released - SL-02 $0 <br />022 Replace Topsoil from Stockpile to Areas 1 and 2, Ponds, Ditches and Roads Released - SL-02 $0 <br />023 Replace Topsoil from Stockpile to Area 3 Released - SL-02 $0 <br />040 Reseed Disturbed Areas 27.80 $14,414 <br />042 Mobilize/Demobilize Equipment for Remaining Reclamation Released - SL-02 $0 <br />043 Mobilize/Demobilize Equipment for Site Maintenance and Reseeding 9.66 $4,532 <br />044 Site Maintenance/Rill and Gully Repair 48.00 $3,396 <br />045 Weed Spraying - Assume 50 Acres Every Year for Three Years 75.00 $13,983 <br />046 Plug and Seal Wells AW-1, AW-2, AW-3, BW-1, BW-2 and BW-3 36.00 $4,022 <br /> <br /> <br /> <br /> Direct Cost Total 196.46 $40,347 <br /> <br /> INDIRECT COSTS <br /> <br /> Overhead and Profit <br /> Liability Insurance (2.02% of Direct Costs) $815 <br /> Performance Bond (1.05% of Direct Costs) $424 <br /> Job Superintendent (at $58.56/hour) 98.23 $5,752 <br /> Profit (10.00% of Direct Costs) $4,035 <br /> <br /> <br /> <br /> Total Overhead and Profit $11,026 <br />jrs Page 1 10-02-11
The URL can be used to link to this page
Your browser does not support the video tag.