Laserfiche WebLink
CIRCES Cost Estimating Software <br />BOREHOLE SEALING WORK <br />PROJECT IDENTIFICATION <br />Task # : 046 State : Colorado Permit/job # : C-1991-078 <br />Date : 0210912011 County : Montrose Abbreviation :none <br />User : JRS Site :Hamilton Mine Filename :C078-046 <br />Agency or organization name: Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : Phase 11 Bond Release SL-02 <br />Task description : Plug and Seal All Wells <br />UNIT COSTS Eouiament cost data source : NA Shift basis : 1 per day <br />BOREHOLE DESCRIPTION SEALING ITEM / METHOD DIAMETER LENGTH QUANTITY UNIT UNIT COST TOTAL COST <br />AW-1, AW-2, AW-3 <br />-Bottom Plug PVC plug - 4 in. 4" 42.5' 3.00 EA $62.78 $188.35 <br />-Fill Holes with Cement Portland cement grout 4" 42.5' 3.70 bag $10.90 $40.33 <br />-Cut Casing at Surface Exp. casing removal, 4-8 in. 4" NA 3.00 LF $5.84 $17.52 <br />-Borehole Marker Borehole marker NA NA 3.00 EA $3.81 $11.43 <br />-Truck and Laborer Flatbed Truck, 6x4, 45K GVW NA NA 12.00 HR $86.79 $1,041.44 <br /> <br />BW-1, BW-2, BW-3 <br />-Bottom Plug PVC plug - 4 in. 4" 445' 3.00 EA $62.78 $188.35 <br />-Fill Holes with Cement Portland cement grout 4" 445' 38.80 bag $10.90 $422.92 <br />-Cut Casing at Surface Exp. casing removal, 4-8 in. 4" NA 3.00 LF $5.84 $17.52 <br />-Borehole Marker Borehole marker NA NA 3.00 EA $3.81 $11.43 <br />-Truck and Laborer Flatbed Truck, 6x4, 45K GVW NA NA 24.00 HR $86.79 $2,082.89 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />JOB COST Total Cost : $4,022