Laserfiche WebLink
Whirlwind Mine <br /> <br />nt <br />SampLng Pi? <br />Sc}dules <br />le "" <br />f a r , ...- <br />Treatment Plant Sample weekly during Ongoing; sampling conducted as <br />Discharge discharge required during discharge events. <br /> Treatment and discharge has been <br /> suspended as of December 9, 2009 <br /> until further notice. <br />Whirlwind Sample for 2 quarters and Completed; 5 samples and 12 <br />Decline (Sump) measure flow for 4 flow/field parameter measurements <br /> quarters collected to date. <br />Packrat Mine Sample for 2 quarters Not Started; the Packrat Mine is not <br />Water when accessible et accessible. <br />DP Spring Measure flow quarterly Ongoing; 12 flow/field parameter <br /> measurements recorded to date. <br />PR Spring Sample and measure flow Completed; 6 samples and flow/field <br /> quarterly for 5 quarters arameter measurements collected. <br /> Measure flow quarterly Ongoing; 5 quarterly flow/field <br /> and sample annually parameter measurements and 1 annual <br /> thereafter sample collected to date. <br />Monitoring Well 8 samples over 15 months Completed; 8 baseline samples <br />W-1 collected to date. <br /> Measure quarterly and Ongoing; 3 quarterly water level <br /> sample annually thereafter measurements and 1 annual sample <br /> collected to date. <br />Lumsden Canyon As needed in support of Two samples collected from 3 points <br /> Hydrogeological Report to in Lumsden Canyon. No further <br /> be prepared by Western sampling events are scheduled at this <br /> Water & Land time. <br />See Surveys Annually Ongoing; 4 see surveys completed. <br />Rajah 49 Mine, Sample as discharge is Ongoing; 2 samples collected to date. <br />Thornton Portal observed in annual seep <br /> surveys <br />Waste Rock Collect grab sample Suspended; 1 annual composite <br /> quarterly and composite sample collected to date. Sampling <br /> annually for analysis suspended until mining resumes. <br />Sediment Pond Sample quarterly if Ongoing Monitoring; no samples <br />Sampling dischar in collected to date. <br />Dolores River Sample during treatment Suspended; not required until water <br />Sampling discharge if flowing into treatment plant resumes operation. No <br /> Dolores River samples collected to date. <br />Table 7 Hydrological Monitoring Summary <br />Page 1 of 1