Laserfiche WebLink
MATERIAL QUANTITIES <br />Selected estimating method: Area <br />Alternate Methods: <br />Seismic: NY <br />Area: 10 <br />Bank Volume NA BCY NA <br />acres Rip Depth (ft) 1.00 Volume: 16,133 <br />Source of estimated quantity: Reclamation plan / drms standard <br />HOURLY PRODUCTION <br />Seismic: <br />Seismic Velocity: NA feet/second <br /> <br />Area: <br />Average Ripping Depth: 3.71 mph <br />Average Ripping Width: 5.56 degrees <br />Average Ripping Length: 50.00 feet <br />Average Dozer Speed: 88.00 feet <br />Average Maneuver Time: 0.25 feet <br />Production per unit area: 0.468 acres/hour <br /> <br />Job Condition Correction Factors <br />Unadjusted Hourly Unit Production: 0.468 Acres/hr <br /> <br />Site Altitude: 7,200 feet <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.83 multiplier <br /> <br />Adjusted Hourly Unit Production: 0.39 Acres/hr <br />Adjusted Hourly Fleet Production: 0.39 Acres/hr <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) Total job time: 25.74 <br /> <br />Unit cost: $448.370 Per acre To tal job cost: $4,484.00 <br />Hours <br />BCY or CCY