Laserfiche WebLink
HOURLY PRODUCTION <br />Average push distance: 80 feet <br />Unadjusted hourly production: 1,110.8 LCY/hr <br />Material consistency description: <br />Compacted fill or embankment 0.9 <br />Average push gradient: 15 % <br />Average site altitude: 7,200 feet <br />Material weight: 3,2501bs/LCY <br />Weight description: <br />Gravel - Pitrun <br />Job Condition Correction Factor Source <br />Operator skill: 0.750 (AVG.) <br />Material consistency: 0.900 (CAT HB)) <br />Dozing method: 1.000 (GEN.) <br />Visibility: 1.000 (AVG.) <br />Job efficiency: 0.830 (1 SHIFT/DAY) <br />Spoil pile: 0.800 (FND-RF) <br />Push gradient: 0.666 (CAT HB) <br />Altitude: 1.000 (CAT HB) <br />Material weight: 0.708 (CAT HB) <br />Blade type: 1.000 (PAT) <br />Net correction: 0.2113 <br />Adjusted unit production: 234.71 LCY/hr <br />Adjusted fleet production: 234.71 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.719 /LCY <br />Total job time: 5.30 Hours <br />Total job cost: $894.71