My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-02-16_REVISION - M1980041
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980041
>
2011-02-16_REVISION - M1980041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:58:08 PM
Creation date
2/22/2011 1:55:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980041
IBM Index Class Name
REVISION
Doc Date
2/16/2011
Doc Name
Cost Summary Work (CN-01)
From
DRMS
To
Rock Gulch Gravel Pit
Type & Sequence
CN1
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />COST SUMMARY WORK <br />PROJECT IDENTIFICATION <br />Task #: CN1 State: Colorado Permit/job#: M1980041 <br />Date: 2/16/201X County: Chaffee Abbreviation: None <br />User: GRM Site: Rock Gulch Gravel Pit Filename: M041-CN1 <br />Agency or organization name: DRMS / <br />Permit or other job action: 2011 Conversion CN-0I <br />Task description: Financial Warranty Summary <br />TASK LIST (DIRECT COSTS) <br />RECEIV50 <br />FEB 18 2011 <br />Division of Reclamation, <br />Mining and Safety <br />Task Form Fleet Task <br />Number Description Used Size Hours Cost /Acre <br />001 cut and fill hi hwall DOZER 1 5.30 $894.71 <br />002 Rip 10 acres max it floor RIPPER 1 25.74 $4,484.00 <br />003 spread 3 inches topsoil over 10 DOZER 1 7.91 $1,359.69 <br /> acres <br />004 Reveg of 10 acres max REVEGE 1 0.00 $17,263.26 <br /> disturbance <br />005 initial reclamation mobilization MOBILIZE 3 2.67 $1,755.69 <br />006 secondary reclamation MOBILIZE 2 2.67 $313.90 <br /> mobilization <br />L SUBTOTALS: 44.29 $ $26,071.25 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />Performance bond: <br />Job superintendent: <br />Profit: <br />2.02 total = $526.64 <br />1.05 total = $273.75 <br />0.00 total = $0.00 <br />10.00 total = $2,607.13 <br /> TOTAL O & P = $3,407.52 <br />CONTRACT AMOUNT (direct + O & P) = $29,478.77 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): 0.00 total = 0.00 <br />Engineering work and/or contract/bid preparation: 0.00 total = $0.00 <br />Reclamation management and/or administration: 5.00 total = $1,473.94 <br />CONTINGENCY: 0.00 total = $0.00 <br />TOTAL INDIRECT COST = $4,881.46 <br />TOTAL BOND AMOUNT (direct + indirect) = $30,952.71
The URL can be used to link to this page
Your browser does not support the video tag.