Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name : DRMS <br />Task #: 001 State :Colorado Permit/job #:M-2010-058 <br />Date : 0211412011 County : Garfield Abbreviation :none <br />User : DMC Site : Cerise Mine Filename : M058-001 <br />Permit or other job action : Preop <br />Task description :Placement of reclamation fill <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Equipment Description <br />Scraper work team -Scraper : Cat 627G w/push-pull <br />-Push dozer: NA <br />Cost Br <br />Support equipment -Load area :INA <br />-Dump area :INA <br />Road maintenance -Motor grader :INA <br />-Water truck :INA <br />iakdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA NA NA NA NA <br />% Utilization-machine : 100 NA NA NA NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cost/hour : $57.56 NA NA NA NA NA <br />Operating cost/hour : $144.12 NA NA NA NA NA <br />Ripper op. cost/hour : NA NA NA NA NA NA <br />Operator cost/hour : $24.98 NA NA NA NA NA <br />Unit subtotals . $226.67 NA NA NA NA NA <br />Number of units : 2 0 0 0 0 --- <br />Group subtotals : Work : $453.33 Support : $0.00 Maintenance : $0.00 <br />Total work team cost/hour : $453.33 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 609,000 LCY factor : NA volume : 609.000 LCY <br />Source of quantity take-off :Exhibit L <br />Source of estimated swell factor : NA