My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-02-15_INSPECTION - M2010058
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M2010058
>
2011-02-15_INSPECTION - M2010058
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:31:02 PM
Creation date
2/22/2011 1:16:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2010058
IBM Index Class Name
INSPECTION
Doc Date
2/15/2011
Doc Name
Inspection report
From
DRMS
To
Lafarge West, Inc.
Inspection Date
2/10/2011
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 004 State : Colorado Permit/job# : M-2010-058 <br />Date : 0211412011 County :Garfield Abbreviation :none <br />User : DMC Site :Cerise Mine Filename :M058-004 <br />Agency or organization name: DRMS <br />Permit or other job action : Preop - <br />Task description : Topsoil application <br />HOURLY EQUIPMENT COST <br />Basic machine: Cat D8R Series 11 - 8U (2005) Horsepower : 310 <br />Blade type :Universal <br /> Attachment no. 1 :ROPS Cab Shift basis : -I per day <br /> Attachment no. 2 :NA <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $39.08 NA <br /> Operating cost/hour : $81.14 100 <br /> Ripper op. cost/hour : $0.00 NA <br /> Operator cost/hour : $38.54 NA <br /> Total unit cost/hour : $158.75 Total fl eet cost/hour : $158.75 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 105,673 LCY factor : NA volume : 105,673 LCY <br />Source of estimated volume :Exhibit L <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 135 feet Material consistency : 1.20 (Cat HB) <br />Unadjusted hourly production : 747.8 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1 shift/day) <br />Loose stockpile Spoil pile : 0.80 (fnd-ro_ <br />-- Push gradient : 0.67 (Cat HB) <br />Average push gradient : 15.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,300 feet Material weight : 1.44 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 1,600 lbs/LCY Net correction : 0.57 <br />Weight description <br />Top Soil Adjusted unit production : 428.10 LCY/hr <br /> Adjusted fleet production : 428.10 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 246.84 Hours <br />Unit cost : $0.371 /LCY Total job cost : $39,186
The URL can be used to link to this page
Your browser does not support the video tag.