My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-02-16_REVISION - P2008046
DRMS
>
Day Forward
>
Revision
>
Prospect
>
P2008046
>
2011-02-16_REVISION - P2008046
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:32:33 AM
Creation date
2/22/2011 12:56:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2008046
IBM Index Class Name
REVISION
Doc Date
2/16/2011
Doc Name
NOI- notice of deficiency (MD-05)
From
DRMS
To
American Shale Oil, LLC
Type & Sequence
MD5
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task #: 12a State :Colorado Permit/job# :P-2008-046 <br />Date : 0211512011 County: Rio Blanco Abbreviation :none <br />User : THM Site :Amso Filename :P046-12a <br />Agency or organization name : DRMS <br />Permit or other job action : Final Reclamation Cost Estimate MD-05 <br />Task description : Spread topsoil over 1.7 acre MWP2 Pad and Road <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D7R DS Series 11- 7SU Horsepower : 240 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :NA <br />Shiftbasis : 1 per day <br /> (CRG) <br />Data source: <br /> - <br />Utilization % <br />Cost Breakdown : Ownership cost/hour : $43.55 NA <br />Operating cost/hour : $64.95 100 <br />Ripper op. cost/hour : $0.00 NA <br />Operator cost/hour : $38.54 NA <br />Total unit cost/hour : $147.04 Total fleet cost/hour : $147.04 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 2,057 LCY factor : NA volume : 2,057 LCY <br />Source of estimated volume :Plan Submitted <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job Condition Correction Factors <br />Average push distance <br />Unadjusted hourly production <br />Material consistency description <br />Loose stockpile <br />100 feet <br />714.3 LCY/hr <br />Average push gradient : 2.00 % (i <br />Average site altitude : 6,900 feet <br />Material weight : 1,600 Ibs/LCY <br />Weight description <br />Top Soil <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) <br />Unit cost : $0.229 /LCY <br />Source <br /> Operator skill : 0.75 (avg.) <br /> Material consistency : 1.20 (Cat HB) <br /> Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br /> Job efficiency : 0.83 (1shift/day) <br /> Spoil pile : 0.80 (fnd-ro <br /> Push gradient : 1.05 (Cat HB) <br /> Altitude : 1.00 (Cat HB) <br /> Material weight : 1.44 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br /> Net correction : 0.90 <br /> <br /> Adjusted unit production : 641.79 LCY/hr <br /> Adjusted fleet production : 641.79 LCY/hr <br /> <br />Total job time : 3.21 Hours <br />Total job cost : $471
The URL can be used to link to this page
Your browser does not support the video tag.