Laserfiche WebLink
CIRCES Cost Estimatinq Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 10a State :Colorado Permit/job# :P-2008-048 <br />Date <br />User <br />02/15/2011 <br />THM <br />County: Rio Blanco <br />Site :Amso <br />Agency or organization name: DRMS <br />Permit or other job action : Final Reclamation Cost Estimate - MD-05 <br />Task description : Spread topsoil over 2.9 acre TM Pad <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D7R DS Series 11 - 7SU <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :NA <br />Shift basis : 1 Der day <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $43.55 NA <br /> Operating cost/hour : $64.95 100 <br /> Ripper op. cost/hour : $0.00 NA <br /> Operator cost/hour : $38.54 NA <br /> Total unit cost/hour : $147.04 Total fleet cost/hour : $147.04 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 3,428 LCY factor : NA volume : 3,428 LCY <br /> <br />Source of estimated volume: Plan Submitted <br />Source of estimated swell factor : NA <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 125 feet Material consistency : 1.20 (Cat HB) <br />Unadjusted hourly production : 600.0 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift/day) <br />Loose stockpile Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 1.05 (Cat HB) <br />Average push gradient : 2.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,900 feet Material weight : 1.44 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 1,600 Ibs/LCY Net correction : 0.90 <br />Weight description <br />Top Soil Adjusted unit production : 539.10 LCY/hr <br /> Adjusted fleet production : 539.10 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 6.36 Hours <br />Unit cost : $0.273 /LCY Total job cost : $935 <br /> <br />Abbreviation :none <br />Filename :P048-10a <br />Horsepower: 240