Laserfiche WebLink
February 16, 2010 C-1992-080/Carbon Junction Mine TK <br />Topsoil replacement depths in the SL-4 bond release area were previously verified during the June 2008 <br />inspection in the Equipment Storage Area and in the Permanently Reclaimed Spoil Area. Topsoil stockpile depths <br />for the areas regraded in early 2009 (Pond 1, Pond 2, and collection ditches) were verified during the March 2009 <br />inspection. Replaced topsoil depths in the North Pit area were observed during topsoil replacement in 2006 and <br />were found to have more than the one-foot required thickness. <br />DOCUMENTS RECEIVED None <br />OTHER (SPECIFY) None <br />ENFORCEMENT ACTIONS/COMPLIANCE <br />No enforcement actions were taken during this inspection and none are pending. <br />Number of Partial Inspection this Fiscal Year: 5 <br />Number of Complete Inspections this Fiscal Year: 3 <br />Page 5 of 8