Laserfiche WebLink
• Pago 7. <br /> 1'r. Robert G. Biglow <br /> 'lanuary 24, 1980 . <br /> 2. Referencing Map C-1, the triangular adjacent tract of: land mar}.ed "Unl-norrm" <br /> should be identified a❑ to owner., and this landoumer should then be notified <br /> as per Rule 2.2 of the rules and Regulations. <br /> 3. ,far C-1 should be changed to reflect the changes of preceding paragraphs 1) <br /> and 2). <br /> •,y ; •4t'•Exhibits'tf-1 and 0-1: <br /> 1. Since the two traits flanking Lot 4 in Section 18 are not within the indicated <br /> affected acreage, you should make certain that Fremont County approval will <br /> cover there two traits as well as the 59.87 acres outlined on Map C-1. <br /> Me Mined Land Reclamation Board, during the January 23, 1980 meeting made a motion <br /> Ni, that the Cease and Desist Order issued to U.S. Soil Condil .oning/J. H. Lionelle on <br /> .:ovember 29, 1979 is to be suspended for two months (until the March 26-27, 1980 <br /> Mined Land Reclamation Board meeting) upon receipt of appropriate surety to be— <br /> set by the Staff.. <br /> Thin, aurp+w Flan bren net at $32,500 for the entire Maverick Placer operation <br /> (inclndi.np thr mine site and ciirn her, stncl:pile and processing areas) of approxi- <br /> mately 40 acres. This surety can(in a form chosen by the operation as set forth <br /> in Rule 7.1. Upon receipt and approval of the surety by the Nined }and reclamation <br /> } staff, I/.S. Soil Conditioning/J. If. Lionelle may resume mining of agricultural <br /> ' minerals in the pit until the ttnrch meeting when the mining and reclamation permit <br /> application will be considered by the Board. A continuance was granted by the - <br /> Roard until that time. <br /> If vot, have anv questions concerning, any of these matters, please call me. I <br /> expect to hear from yo,i soon. <br /> Einr.rY `7•• <br /> 11,111' 3. ?.oyc <br /> Reclamation Spncialist <br /> • <br /> . • r- <br />