Laserfiche WebLink
Mr. Jared Dains, E.I. <br />February 9, 2011 <br />Page 6 of 6 <br />appropriators. As such, water quality data or analysis may be requested at any time to <br />determine if the water quality is appropriate for downstream water users. <br />17. The decision of the state engineer shall have no precedential or evidentiary force, shall <br />not create any presumptions, shift the burden of proof, or serve as a defense in any <br />pending water court case or any other legal action that may be initiated concerning this <br />plan. This decision shall not bind the state engineer to act in a similar manner in any <br />other applications involving other plans, or in any proposed renewal of this plan, and <br />shall not imply concurrence with any findings of fact or conclusions of law contained <br />herein, or with the engineering methodologies used by the Applicant. <br />If you have any questions concerning this approval, please contact Sarah Reinsel in <br />Denver at (303) 866-3581 or Claudia Engelmann in Greeley at (970) 352-8712. <br />Sincerely, <br />G. Rein, P.E. <br />Assistant State Engineer <br />Attachments: Figures 1 and 2 <br />Tables 1 and 2 <br />Water Lease Agreement (Graham Ditch) <br />Water Lease (Platte River Power Authority) <br />Letter from DRMS dated April 30, 2010 <br />cc: Claudia Engelmann, Assistant Division Engineer, Div1AccountinaCa-state.co.us <br />810 9t' Street, Suite 200, Greeley, CO 80631 <br />George Varra, Water Commissioner, Water District 3, George.Varrao-state.co.us <br />1400 Hwy 287 N, Fort Collins, CO 80524 <br />Division of Reclamation Mining and Safety <br />KGR/skr: Loloff Pit (2011).doc