Laserfiche WebLink
Table 2 <br />Accounting <br />Loloff Pit Substitute Water Supply Plan <br />Accounting Forth Date Revised: it/18/2o10 <br />AG Job ilk 04157 <br />WY 2q?o <br /> <br /> <br /> <br /> <br />onth APOW t on <br />Recjuirement <br /> <br /> <br />' ac--fit <br />/? ; Platte, river <br />Lease <br />Amount <br /> <br />q,acft , <br />13 s elaitekRiver <br />Lease <br />Credit:; <br /> <br />ac ft <br />C graham Duch _ <br />Lease <br />Amount <br />:- <br />ac ft <br />D " Graham-Ditch <br />Lease, <br />Credit: <br /> <br />ac-ff <br />E Net Effect ; <br />tq River <br /> <br /> <br />ft] <br />Jan-ti 1.19 <br />Feb-ii 1.18 <br />Mar-ti 1.28 <br />Apr-ii 1.53 <br />May-ii 1.94 <br />Jun-ii 2.50 <br />Jul-1t 3.u <br />Aug 11 3.43 <br />Sepm 3.32 <br />Oct-11 2.87 <br />Nov-ti 2.30 <br />Dec ii 1.83 <br />Total 26.49 <br />Unit Transit Loss = 0.25% per mile <br />Platte River Power Transit Distance = 30.3 miles <br />Platte River Power Total Transit Loss = 7.58% <br />Graham Ditch Transit Distance = 4.3 miles <br />Graham Ditch Total Transit Loss = 1.08% <br />Notes: <br />(A) Augmentation Requirement equal to lagged depletions from Table No. I <br />(B) Lease with Platte River Power Authority. Due to location above depletions, transit losses are assessed <br />(C) Platte River Lease Credit = (B)"(t - Platte River Power Total Transit Loss) <br />(D) Lease with Graham Ditch Company. Due to location above depletions, transit losses are assessed <br />(E) Graham Ditch Lease Credit = (D) • (i - Graham Ditch Total Transit Loss) <br />(F) Net Affect to River = (C) + (E) - (A)