Laserfiche WebLink
-4- <br />12. Primary future (Post mining) land use (check one): <br />U Cropland(CR) Pastureland(PL) <br />Rangeland(RL) ? Forestry(FR) <br />Residential(RS) Recreation(RC) <br />Developed Water Resources(WR) <br />_0 13. <br /> <br />Cropland(CR) ?U Pastureland(PL) <br />Rangeland(RL) L_I Forestry(FR) <br />Residential(RS) Recreation(RC) <br />Developed Water Resources(WR) <br />-EIGeneral Agriculture(GA) <br />Wildlife HabingWL) <br />X Industrial/Commercial(IC) <br />F]Solid Waste Disposal(WD) <br />_ General Agriculture(GA) <br />II Wildlife Habitat(WL) <br />Industrial/Commercial(IC) <br />14. MethodofMining: Briefly explain mining method (e.g. truck/shovel): T,ahorers manually stack stone <br />from existing stockpile onto pallets according to shape, size.& color <br />15. On Site Processing: LI Crushing/Screening <br />13.1 Briefly explain mining method (e.g. truck/shovel): Hydra u 1 i c splitters are used to cut <br />and shape some of the pieces to meet customer specifications. <br />List any designated chemicals or acid-producing materials to be used or stored within permit area: <br />Fuel storage only <br />16. Description of Amendment or Conversion: <br />lfyou are amending or converting an existing operation, provide a briefnarrative describing the proposed change(s). <br />N/A