My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-02-09_HYDROLOGY - C1981018
DRMS
>
Day Forward
>
Hydrology
>
Coal
>
C1981018
>
2011-02-09_HYDROLOGY - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:30:54 PM
Creation date
2/10/2011 8:58:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
HYDROLOGY
Doc Date
2/9/2011
Doc Name
2010 Stormwater Annual Report
From
DRMS
To
Blue Mountain Energy
Permit Index Doc Type
NPDES
Email Name
JRS
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STORMWATER ANNUAL REPORT - METAL MINING (& COAL) <br />COLORADO DEPT. OF PUBLIC HEALTH & ENVIRONMENT <br />Water Quality Control Division <br />WQCD-P-B2 <br />4300 Cherry Creek Drive South <br />Denver, Colorado 80246-1530 <br />Make enough copies of form for each reporting year. Check box if this is a <br />new name, address, etc. <br />Permittee (Company Name): Blue Mountain Energy, Inc. <br />Facility Name: Deserado Mine ? <br />Mailing Address: 3607 County Road 65; Rangely, CO 81648 ? <br />Facility Phone Number: (970) 675-4322 ? <br />Permit Certification No. COR-04 0 1 7 2 <br />Reporting Period: Jan. 1-Dec. 31, 20 1 Form is due by Feb. 15 of the following year) <br />**Each section must be completed. Please print or type.** <br />A. A report on the facility's overall compliance with the SWMP. (Include here a summary of any measures taken <br />to comply with your Stormwater Management Plan (SWMP), to fully implement it, changes or improvements made <br />in any of your Best Management Practices (BMPs), employee training, spills, other problems encountered, etc. <br />How is your plan working?) <br />See attached (A) <br />Were changes made to your SWMP? © No Fj Yes - Describe changes on a separate sheet. <br />B. A summary of each comprehensive stormwater facility inspection made, including date, findings, and action <br />taken. (The permit requires at least two comprehensive facility inspections per year - see page 12 of the permit. <br />Include here a summary of those inspections, plus any other comprehensive inspections made. It is not necessary <br />to summarize day-to-day inspections, unless significant problems were noted.) <br />First Inspection - Date Findings, and action taken: <br />See attached (B) <br />Note - form may be reproduced Page 1 of 2 ar6/06mm
The URL can be used to link to this page
Your browser does not support the video tag.