My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-02-07_REVISION - M1979045 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1979045
>
2011-02-07_REVISION - M1979045 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:24 AM
Creation date
2/9/2011 10:10:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979045
IBM Index Class Name
REVISION
Doc Date
2/7/2011
Doc Name
Adjustment to Required Financial Warranty
From
DRMS
To
Lakewood Brick & Tile Company
Type & Sequence
SI1
Email Name
DB2
AJW
MR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HOURLY PRODUCTION sheet 2 of 2 <br />Hauling Capacity : <br />Scraper Payload (weight) Basis : Scraper Bowl (volume) Basis : <br />Material weight : 2,650 pounds/LCY Struck volume : 32.00 LCY <br />Material description : Heaped volume : 44.00 LCY <br />Decomposed rock - 25% Rock, 75% Earth Average volume : 38.00 LCY <br />Rated payload : 104,000 pounds Adjusted capacity : 38.00 LCY *** <br />Payload capacity : 39.25 LCY *'* hourly production reflects volume per scraper pair on push-pull models <br />Cycle Time : Job Condition Corrections : Site altitude (ft.) : 5,000 <br /> Scraper Push dozer Source <br />Scraper loading time 1.65 minutes Altitude adj.: 1.000 NA (Cat HB) <br />Maneuver and spread time : 0.60 minutes Job efficiency : 0.830 NA (Cat HB) <br />* load time per scraper pair on push-pull models Net correction : 0.830 NA <br />Travel time : <br />Road condition description :Firm, smooth, rolling, dirt/It. surfaced, watered, maintained <br />Haul Rnuta <br />Seg. # Haul distance (feet) Grade (%) Roll. res. (%) Total res. (%) Velocity (fpm) Travel time (min.)** <br />1 800 5.00 3.00 8.00 1426 0.66 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Haul time : <br />Return route 0.66 minutes <br />1 800 -5.00 3.00 -2.00 2987 0.33 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />travel time for each segment is adjusted for acceleration/deceleration. Return time : <br />table velocities are max. attainable per total resistance shown, not average <br />Total scraper team cycle time (load + haul + maneuver and spread + return) : <br />Unadjusted unit production/hour : 702.57 LCY/hour *** Adjusted for job conditions : <br />Optimal number of scrapers per push dozer : NA Selected number of scrapers : <br />Adjusted single scraper team (unit) hourly production : <br />Adjusted multiple scraper team (fleet) hourly production : <br />JOB TIME AND COST <br />Fleet size : 1 Team(s) Total job time : <br />Unit cost : $0.620 /LCY Total job cost : 0.33 <br /> <br />3.25 <br />583.14 <br />8 <br />4,665.09 <br />4,665.09 <br /> <br />21.44 <br />$61,984 minutes <br /> <br />minutes <br />LCY/hour <br />scraper(s) <br />LCY/hour <br />LCY/hour <br /> <br />Hours <br />
The URL can be used to link to this page
Your browser does not support the video tag.