Laserfiche WebLink
CIRCES Cost Estimatinq Software <br />BULLDOZER WORK <br />:.:.........:.::.::::......::::::::::::::::::::::::. , ..:::::.::::.:.:................................................................................ . <br />PROJECT IDENTIFICATION <br />Task #: D9b State : Colorado Permit/job# : M-1979-045 <br />Date <br />User <br />02/01/2011 <br />DB2 <br />County: Jefferson <br />Site : Church Pit <br />Abbreviation :none <br />Filename : M045-D9b <br />Agency or organization name : DRMS <br />Permit or other job action : Inspection <br />Task description : Regrade site; knock down berms - First Revision after SOB edits <br />................................................................ . <br />:.; :. <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D9R - 9U (2005) Horsepower : 405 <br />Blade type : Universal <br />Attachment no. 1 :ROPS Cab Shift basis:- 1 perday <br />Attachment no. 2:3-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $67.77 NA <br /> Operating cost/hour : $101.59 100 <br /> Ripper op. cost/hour : $0.80 10 <br /> Operator cost/hour : $38.54 NA <br /> Total unit cost/hour : $208.70 Total fleet cost/hour : $208.70 <br />, <br />XXXXX <br />MATERIAL QUANTITIES ....................................... ......................................... . <br />Initial Swell Loose <br />volume : 124,000 LCY factor : NA volume : 124,000 LCY <br /> <br />Source of estimate d volume : Estimated from site map <br />Source of estimated swell factor :NA <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 50 feet Material consistency : 1.20 (Cat HB) <br />Unadjusted hourly production : 2,222.9 LCY/hr Dozing method : 1.10 (50% sl) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift/day) <br />Loose stockpile Spoil pile: 0.80 (fnd-ro <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 5,000 feet Material weight : 0.79 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,900 Ibs/LCY Net correction : 0.52 <br />Weight description : <br />Sand and gravel - Dry Adjusted unit production : 1158.50 LCY/hr <br /> Adjusted fleet production : 1,158.50 LCY/hr <br /> <br />::::::::::::::::::::::::::::::::::.... <br />JOB TIME AND COST ......:............................. ............................................................. . <br />Fleet size : 1 Dozer(s) Total job time : 107.03 Hours <br />Unit cost : $0.180 /LCY Total job cost : $22,338 <br />