My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-02-07_REVISION - M1979045 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1979045
>
2011-02-07_REVISION - M1979045 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:24 AM
Creation date
2/9/2011 10:10:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979045
IBM Index Class Name
REVISION
Doc Date
2/7/2011
Doc Name
Adjustment to Required Financial Warranty
From
DRMS
To
Lakewood Brick & Tile Company
Type & Sequence
SI1
Email Name
DB2
AJW
MR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.... <br />of, AnAD1 C Cr1111DMCNT sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-Water Tanker, 3,500 Gal. $58.34 1 $58.34 $58.34 <br />-Fuel Tanker, 4x2, 170 HP $71.21 1 $71.21 $71.21 <br />-tube Truck, 4x2, 170 HP $79.11 1 $79.11 $79.11 <br />-Light Duty Pickup, 44, 314 T. $50.59 1 $50.59 $50.59 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $259.25 $259.25 <br />............... X . <br />EQUIPMENT HAUL DISTANCE and TIME <br />Nearest major city or town within project area region <br />Transportation Cycle Time : Non- Total one-way travel distance <br />Roadable Roadable Average travel speed <br />Equipment Equipment <br />Haul time (hours) = 0.22 0.22 <br />Return time (hours) = 0.22 0.22 <br />Loading time (hours) = 0.50 NA <br />Unloading time (hours) = 0.50 NA <br />Subtotals = 1.44 0.44 <br />Total non-roadable mob/demob cost " <br />* two round trips with haul rig <br />Total roadable mob/demob cost "" <br />** one round trip, no haul rig <br />Golden <br />10.0 miles <br />45.0 mph <br />$8,160.00 <br />$115.22 <br />............... ......................................__ <br />JOB TIME AND COST Total job time : 2.89 hours <br />Total job cost : $8,275
The URL can be used to link to this page
Your browser does not support the video tag.