My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-02-07_REVISION - M1979045 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1979045
>
2011-02-07_REVISION - M1979045 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:24 AM
Creation date
2/9/2011 10:10:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979045
IBM Index Class Name
REVISION
Doc Date
2/7/2011
Doc Name
Adjustment to Required Financial Warranty
From
DRMS
To
Lakewood Brick & Tile Company
Type & Sequence
SI1
Email Name
DB2
AJW
MR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources 2 <br />W <br />1313 Sherman St., Room 215 ?? <br />COLORADO <br />Denver, Colorado 80203 IV IS ' ON OF <br />D <br />Phone: (303) 866-3567 RECLAMATION <br />FAX: (303) 832-8106 MINING <br /> <br /> SAFETY <br />7 February 2011 <br /> John W. Hickenlooper <br /> Governor <br />Thomas Murray Mike King <br />Executive Director <br />(r Lakewood Brick & Tile Company <br />1325 Jay Street Loretta E. Pineda <br />Lakewood, CO 80214-2052 Director <br />Re: Church Pit, Permit No. M-1979-045, Adjustment to Required Financial Warranty, <br />Revision No. SI-1 <br />Dear Mr. Murray: <br />Following meetings and correspondence with Mr. Stevan O'Brian of Environment Inc. related to the <br />Notice of Financial Warranty Increase sent by the Division of Reclamation, Mining, and Safety <br />(Division) on 2 September 2010, the Division has adjusted the required Financial Warranty for the <br />Church Pit down to $319,000. The CIRCES worksheets showing the revised calculations are enclosed. <br />The Division currently holds a financial warranty in the amount of $84,700 for the Church Pit. <br />Therefore, Lakewood Brick & Tile must submit an additional $234,300 to bring the total financial <br />warranty held by the Division up to $319,000. The due date for submittal of the additional financial <br />warranty is 4 March 2011. The Division is unable to accommodate any further extensions of this <br />deadline. <br />Be advised that if changes occur to the landscape of the site due to factors such as sale of material or <br />concurrent reclamation that result in a reduction of the amount of financial warranty required to reclaim <br />the site, the operator may at any time submit to the Division a request for surety reduction, after which we <br />would inspect the site and evaluate the request. <br />You may contact me with questions at (303) 866-3567 x 8108. For questions pertaining to the financial <br />warranty, please contact Mary Rodriguez at (303) 866-3567 x8138. <br />Sincerely, <br />aQ6W <br />David Bird <br />Division of Reclamation, Mining and Safety <br />Enclosure: CIRCES reclamation cost worksheets <br />cc: Steve O'Brian - Environment Inc. (via email) <br />Mary Rodriguez - DRMS (via email) <br />Office of Office of <br />Minad land Reclamation Denver • Grand )unction • Durango Active and Inactive Mines
The URL can be used to link to this page
Your browser does not support the video tag.