Laserfiche WebLink
February 1, 2011 C-1983-059/Terror Creek Loadout JJD <br /> and locked.The light use road along the railroad tracks was snow covered but passable. <br /> REVEGETATION—Rule 4.15 110 Vegetative Cover;Timing: <br /> Due to the snow cover,the vegetation cover on the bench outslope was not visible. <br /> SLIDES and DAMAGE -Rule 4.12: <br /> The outslope of the facilities bench was stable,as was the cut slope behind the facilities bench. <br /> SUPPORT FACILITIES -Rule 4.04: <br /> No problems were seen at the loadout office, substation, fuel facility,material storage area,weigh station, <br /> grizzly and the coal handling structures. <br /> SIGNS AND MARKERS—Rule 4.02: <br /> The permit boundary markers were up around the site.Mine identification signs were up at the main <br /> entrance, east entrance and next to the railroad tracks. <br /> TOPSOIL—Rule 4.06❑[]Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3; <br /> Redistribution 4.06.4: <br /> The east side topsoil stockpile and the associated collection and diversion ditches were partially covered in <br /> snow.The vegetated cover on the stockpile was moderate and the topsoil signs were up.The topsoil stockpile on <br /> the west side of the loadout was also partially covered in snow.The vegetation on the stockpile had a good cover <br /> and the collection ditch/berm was in place.Topsoil stockpile signs were up on this pile as well. <br /> SEALING OF DRILLED HOLES AND UNDERGROUND OPENINGS—Rule 4.07 <br /> RECLAMATION PLAN COMPLIANCE—Rule 4.13 <br /> DOCUMENTS RECEIVED-None <br /> OTHER(SPECIFY) <br /> Number of Partial Inspection this Fiscal Year: 5 <br /> Number of Complete Inspections this Fiscal Year: 3 <br /> Page 3 of 5 <br />