Laserfiche WebLink
DEPARTMENT OF NATURAL RESOURCES A1J \0 1A lE GSS <br />DIVISION OF WATER RESOURCES <br />John W. Hickenlooper <br />Governor <br />Mike King <br />Executive Director <br />Dick Wolfe, P.E. <br />Director/State Engineer <br />Response to Reclamation Permit Conversion Application Consideration <br />DATE: February 7, 2011 <br />TO: Wallace H. Erickson, Environmental Protection Specialist Cts'fl? <br />CC: Division 7 Office; District 33 Water Commissioner <br />FROM: Caleb Foy, E.I.T. FEB 0 7 2611 ? <br />RE: May Day Idaho Mine Complex, File No. M-1981-185 EviS3oAoffeImxwn <br />Operator: Wildcat Mining Corporation Neft WA <br />Contact: George Robinson, (303) 832-7664 <br />Section 28, Twp 36N, Rng 11 W, N.M.P.M., La Plata County <br />CONDITIONS FOR APPROVAL <br />® If stormwater is contained on-site, it must infiltrate into the ground or be released to the natural <br />stream system within 72 hours, or all work must cease until a substitute water supply plan, or <br />augmentation plan approved by water court, is obtained. Reclamation plans must ensure water will <br />not be retained onsite for more than 72 hours unless an augmentation plan approved by water court <br />is obtained. <br />® The proposed operation will consume ground water by: ? evaporation, N dust control, <br />? reclamation, ? water removed in the mined product, N processing, ? other:. <br />Prior to initiation of these uses of the ground water decreed in Case No. 80CW133, the applicant <br />will need to permit the structure which is diverting ground water (May Day Mine Portal). However, <br />prior to obtaining a permit, an approved water supply plan or decreed plan for augmentation is <br />required. The applicant will need to provide evidence of commitment from Fairfield Land Co. to <br />document the lease of water decreed in Case No. 80CW 133. The said decree adjudicated 0.09 CFS <br />(40 GPM) of water, and not 0.22 CFS (100 GPM) as claimed in the application. <br />® Prior to approving a well permit, the applicant must conduct a field inspection of the site and <br />document the locations of all wells within 600 feet of the permit area. The applicant must then <br />obtain a waiver of objection from all well owners with wells within 600 feet of the permit area or <br />request a hearing before the State Engineer. <br />® Prior to construction of a non jurisdictional size dam, the applicant must submit notice of intent to <br />construct the dam on forms provided by the State Engineer (available online at <br />http://water.state.co.us/DWRIPub/Documents/ds-impound.pdf) not less than 45 calendar days prior <br />to the proposed construction. <br />RECEIVPr" <br />FEB 0 7 N' i <br />Office of the State Engineer aCt y "KAi <br />1313 Sherman Street, Suite 818 • Denver, CO 80203 • Phone: 303-866-3581 • Fax: 3 1 IT sar8ty <br />http://water.state.co.us