My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-12-08_PERMIT FILE - C1981008A (59)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981008
>
2010-12-08_PERMIT FILE - C1981008A (59)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2019 9:14:54 AM
Creation date
2/8/2011 11:08:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
12/8/2010
Doc Name
Reclaimed San Miguel Power Drainage Channel Design
Section_Exhibit Name
Section 2.05.4(2)(c) Attachment 2.05.4(2)(c)-3
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
peak velocity was belowthe limiting velocity of 5.0 fps. Below is a summary of the input factors and <br />the results determined by the computer program. <br />Channel Factor <br />Channel CC -CC' <br />Q <br />32.55 cfs <br />Z (side slopes) <br />10:1 <br />Shape <br />Trapezoidal <br />n <br />0.030 <br />Limiting Velocity <br />5.0 fps <br />Slope <br />0.0370 ft /ft <br />Results <br />Normal Depth (dn) <br />0.24 ft <br />Flow velocity <br />4.21 fps <br />Channel width <br />30 ft <br />Based on the above results, the reclaimed drainage channel will be generally flat bottomed with a <br />minimal width of 30 feet. The bottom will be relatively flat with minute channeling. Added rock may <br />be placed for energy dissipation. <br />The reclaimed drainage channel will be topsoiled and revegetated according to Section 2.05.4(2)(d) <br />and (e) <br />(Revised June 2010) ATTACHMENT 2.05.4(2)(C)- 3 -2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.