My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-02-04_HYDROLOGY - C1981014 (3)
DRMS
>
Day Forward
>
Hydrology
>
Coal
>
C1981014
>
2011-02-04_HYDROLOGY - C1981014 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:29:55 PM
Creation date
2/7/2011 1:41:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
HYDROLOGY
Doc Date
2/4/2011
Doc Name
4th Quarter 2010 Sedimentation Pond Report (Emailed)
From
Energy Fuels Coal, Inc
To
DRMS
Permit Index Doc Type
Sediment Pond Inspect
Email Name
JHB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Feb 04 2011 3:33PM ENERGY FUELS <br />02/0412011 FRI 14104 FAX 17196490471 xsV Elk Cosl <br />ANNUAL SEDIMENTATION POND INSI <br />CDMR Rule 4.05.9(14) and 4.01 <br />Mine: Southfield <br />NPDES ID. No.: Coal Loadout Sediment Pond #1 05 <br />Inspection Period: Fourth Quarter 2010 <br />Insp4ction Date: December 23, 2010 <br />General Description or Reference to Site Plan: <br />This pond is located at the oast end of the remote coal loadout <br />EMBANKMENT <br />1). Adequacy of the vegetative oover: Excellent <br />2). Erosion forming Gullies: Extensive <br />3). Is wave action cauaino erosion: <br />On the Upstream embankment? <br />At the principal spillway inlet? <br />4). Erosion of the downstream toe of the embankment? <br />Cause of erosion can be attributed to. <br />7197844352 page 6 <br />®005/008 <br />(15) <br />REPORT <br />. The facility is inactive. <br />Few Poor <br />Few <br />Yes NO 16-' <br />Yea <br />Yes No <br />5). Is sespege occurring through the dam? <br />Could ttis, seepage cause potential instability? <br />Yes No A <br />PRINCIPAL SPILLWAY <br />1). Is the principal spillway system in working order? <br />2). Is the inlet free of debris and restrictive material? <br />3). Is the discharge outlet free of restrictive material? <br />4). Is erosion occurring at the discharge outlet? <br />Evaluate the severity: Extensive Moderate <br />Yes No <br />Yes v No <br />Yes No <br />Yeses No ?r <br />Just starting None <br />Page 1 of 2
The URL can be used to link to this page
Your browser does not support the video tag.