My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-02-04_HYDROLOGY - C1981014 (2)
DRMS
>
Day Forward
>
Hydrology
>
Coal
>
C1981014
>
2011-02-04_HYDROLOGY - C1981014 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:29:55 PM
Creation date
2/7/2011 1:41:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
HYDROLOGY
Doc Date
2/4/2011
Doc Name
1st Quarter 2010 Sedimentation Pond
From
Energy Fuels Coal, Inc
To
DRMS
Permit Index Doc Type
Sediment Pond Inspect
Email Name
JHB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Feb 04 2011 3:42PM ENERGY FUELS <br />Nov 0810 03:02p New ElkCoal Company <br />QUARTERLY SEDIMENTATION POND <br />CDM Ft Rule 4.05.9(1' <br />Milne: Southfield <br />NPDES ID. No.: Pond <br />Inspection Period: First i <br />Inspection Date: Marol <br />7197844352 <br />1-719-845-0077 <br />PECTION REPORT <br />General Description or Reference to 8ito Plan: <br />This sediment control pond lies north east cf the main facilities area All drainage from the <br />reclaimed mine faciNties area is directed to this pond. The primary discharge gate has been disabled <br />in the open position, ensuring that the pond functions as a "pass-through" facility. <br />EMBANKMENT <br />1). Adequacy of the vegetative cover: <br />2). Erosion forming Gullies: <br />3). Is wave action causing erosion; <br />On #w Upstream embankment? <br />At the principal spillway inlet? <br />4). Erosion of the downstream toe of the embankment? <br />Cause of erosion can be attributed to: <br />Excellent ode Few <br />Extensive Some - <br />5). is seepage occurring through the dam? <br />Could this seepage cause potential instability? <br />PRINCIPAL SPILLWAY <br />1). Is the princ W spillway system in working order? <br />2). Is the inlet free of debris and restrictive material? <br />3). Is the discharge outlet free of restrictive material? <br />4). Is erosion occurring at the discharge outlet? <br />Evaluate the severity: Extensive <br />Page 1 of 2 <br />Poor <br />None <br />p.4 <br />page 4 <br />Yes No G- <br />Yes No v- <br />yes No !--- <br /> <br />Yes No <br /> <br />Yes Cr No <br />Yes i/ No <br />Yes No <br />Yes No Y <br />Just starting <br />I <br />i None
The URL can be used to link to this page
Your browser does not support the video tag.