Laserfiche WebLink
-Rol 55S American Shale Oil, <br />110 East 3`d Street, Suite 201 <br />P.O. Box 1470 <br />Rifle, CO 81650 <br />Phone: 970-625-4324 <br />Fax: 970-625-4318 <br />R coo' <br />FEB 0 7 2011 <br />Division of Reclamation, <br />tifming and Safety <br />January 31, 2011 <br />Mr. Kent Walter, Manager <br />White River Field Office <br />Bureau of Land Management <br />220 East Market Street <br />Meeker CO 81641 <br />Mr. Travis Marshall, <br />Environme l Protection Specialist <br />CDRMS <br />101 South 3`d Street, Suite 301 <br />Grand Junction CO 81501 <br />R: <br />JAN 3 A 2011 <br />G? '!j LJ ?%i i ICE <br />RE: Amendment to Plan of Development <br />BLM Oil Shale Lease COC69169 / <br />Modification to Existing Notice of tent <br />DRMS NOI No. P-2008-046 <br />Dear Kent and Travis: <br />AMSO is submitting this revised drawing to our Plan of Development (POD) and modification <br />to our 'Notice of Intent to -Conduct Prospecting' (NOI) for your approvals. <br />In order to accommodate drilling equipment and monitoring equipment, AMSO requests an <br />expansion (1.16 acre) of the previously approved TM Pad. The northwest side of the TM Pad <br />will be extended 50 feet beyond our established "Limits of Disturbance" and the northeast side <br />will be extended 150 feet beyond our established "Limits of Disturbance" as shown in Figure <br />A.3 (Exhibit A). A chain-link fence will be erected around the TM Pad after construction. <br />Within the area of the proposed disturbance; vegetation will be removed (including 3-4 small <br />trees); and topsoil will be stripped, stockpiled, and seeded. AMSO will move the existing <br />sediment sump approximately 175 down the existing ditch along the road to the MWP-2 Pad. <br />We want to do the dirt work as soon as possible; your expedited approvals would be appreciated. <br />Sincerely, <br />0 , ?y <br />Roger L. Day <br />VP of Operations <br />LLC <br />?