Laserfiche WebLink
Table No. 1 Applegate <br />Group, t.- <br />Lafarge West, Inc. <br />Combined South Platte River Substitute Water Supply Plan <br />Lagged Stream Depletions <br /> <br />Month Howe <br />Pit <br />Depletions <br />M-78-052 <br />(ac-ft) <br />A Mann Lakes <br />Pit <br />Depletions <br />M-82-147 <br />(ac-ft) <br />B Riverbend <br />West <br />Depletions <br />M-85-088 <br />(acre-feet) <br />D Riverbend <br />East <br />Depletions <br />M-04-078 <br />(ac-ft) Total <br /> <br />Depletions <br /> <br />(ac-ft) <br />E <br />Nov-10 1.17 0.44 0.86 6.60 9.07 <br />Dec-10 0.62 0.00 0.78 5.92 733 <br />Jan-11 1.72 0.00 0.71 5.39 7.82 <br />Feb-11 2.01 0.00 0.65 5.20 7.86 <br />Mar-11 2.06 0.00 0.61 5.81 8.47 <br />Apr-11 2.42 0.00 0.60 7.33 10.35 <br />May-11 2.52 0.00 0.65 8.90 12.07 <br />Jun-11 2.55 0.00 0.72 10.33 13.60 <br />Jul-11 2.56 0.00 0.80 11.60 14.96 <br />Aug-11 2.57 0.00 0.87 12.18 15.62 <br />Sep-11 2.58 0.00 0.92 11.98 15.48 <br />Oct 11 2.24 0.00 0.93 10.63 13.79 <br />Total 25.0 0.4 9.1 101.9 136.4 <br />(A) Total lagged mining depletions which reflect existing steady state conditions at the Howe Pit. <br />(B) Total lagged mining depletions which reflect exsting steady state conditions at the Mann Lakes Pit. <br />(C) Total lagged mining depletions which reflect e)asbng steady state conditions at the Riverbend West Pit <br />(D) Total lagged mining depletions which reflect steady state conditions at the Riverbend East Pit <br />(E) Total depletions to the South Platte River, (A)+(B)+(C)+(D) <br />NA101081frp. SW S1%%SWSP.ISWh PW. C-W,.d=1 Ew".d W.W W R-W CU. h