Laserfiche WebLink
<br />Empress Gold Mining & Milling Inc. <br />23. There will be no top soil removed during our operation. We have now reduced our area <br />to less than 1/4 acre. <br />24. None. <br />25. Not laterally. <br />26. Adit will have a concrete enclosure with steel doors. Pit will be made of concrete and <br />remain in place. We really don't know any areas that will require seeding. <br />27. This was not included other than the state regulation we provided. Our only option will <br />be to meet the State specs provided. <br />28. Included. <br />29. We were advised you would provide amount before we were to issue funds. <br />We hope this helps answer your questions. Please let us know if you have any further <br />questions. <br />We appreciate your cooperation in this matter. <br />Sincerely, <br />Robert brizio <br />President / CEO <br />Page 3 of 3