Laserfiche WebLink
Colorado Division of Reclamation, Mining and Safety <br />Annual Reclamation Report for the Year 2010 <br />Coal Ridge No. 1 Mine C-1984-065 <br />mine name permit # <br />Address: 2352 North 7th Street, Unit B, Grand Junction, CO 81501 <br />C. B. Minerals Company, LLC <br />Permittee <br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upon <br />by the Division. It should include text, discussion, and maps, at a minimum, in addition to any other <br />reclamation monitoring data as required by the approved permit. The location of the acreage reported <br />under each land status category and year of seeding (if applicable) should be clearly and accurately <br />identified on a map included with the report. <br /> <br />Land Status Category Last Years <br />Cumulative Total This Calendar <br />Year <br />Cumulative Total' <br />Acres disturbed -0- + -0- 45.2 <br />Acres backfilled and graded -0- + -0- 38.4 <br />Acres to soiled -0- + -0- 38.4 <br />Seeding typically begins the minimum 10-year reclamation liability period. Please report the acres for <br />each cateoorv hPinvv nn not inrll visor arras that have nrhicvcrl find Dk- III elr n <br /> Last Years This Greater <br /> Cumulative Calendar Cumulative 10 years or than 10 <br /> Total year Total' less ears' <br />Acres seeded* 38.4 + -0- = 38.4 -0- 38.4 <br /> = + <br />w uuc, n i lui vaaai y, a u-j- iNuul I ul al ly duyl l lel lieu seeuing or cultural practices <br />For the Entire Life of Mine, the total number of acres disturbed 45.2 and the total number of acres: <br />Phase.I released 38.4 Phase II released 38.4 Phase III released -0- <br />For Mines in Permanent Cessation: <br />Total acreage in facilities subject to reclamation but yet to be completed 6.8 <br />For Government Performance and Results Act <br />Acreage in long-term mining or reclamation facilities 2 6.8 <br />Acreage in active mining areas 3 <br />-0- <br />'(exclude acres where Phase III release has been achieved) <br />2 Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and <br />collector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas; <br />office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal conveyors; nonbackfilled and <br />graded areas of refuse piles, coal mine waste impoundments, head-of-hollow fills, and valley fills; ventilation shafts and entryways; <br />and noncoal waste disposal area (garbage dumps and coal combustion by-products disposal areas). <br />3 Includes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and graded