My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-02-03_REVISION - C1981044
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981044
>
2011-02-03_REVISION - C1981044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:29:54 PM
Creation date
2/4/2011 9:10:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
REVISION
Doc Date
2/3/2011
Doc Name
Letter & Application
From
BTU Empire Corporation
To
DRMS
Type & Sequence
MR49
Email Name
JRS
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of {^pCO-?.o, <br />OLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />*,g76 • 1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866-3567 <br />APPLICATION FORM FOR A REVISION <br />TO A COAL MINING AND RECLAMATION PERMIT <br />This form must be completed and submitted with all requests for minor revisions, as defined in Rule 1.04(73), technical <br />revisions, as defined in Rule 1.04(136), and permit revisions, as defined in Rule 1.04(90). All revisions are to address the <br />requirements of Rule 2.08.4. Three (3) copies of the revision, including maps, must be submitted in order for it to be <br />complete. <br />All revisions are to be formatted so they can be inserted into the permit to replace the revised sections, maps, tables and/or <br />figures, with a revised table of contents, if necessary. The revision submittal date should be printed in the lower right corner of <br />each revision page. A cover letter to the revision should explain the nature of the revision and reference the specific permit <br />sections being revised. <br />For federal mines, a copy of the revision application must be submitted to all agencies on the federal mailing list (except OSM) <br />at the same time the application is submitted to the Division, and proof of distribution must be submitted to the Division along <br />with the application. Copies of revision pages modified during the review process must be distributed in the same manner, <br />along with proof of distribution. Proof of distribution must be submitted prior to implementation of the revision. <br />Permit No.: C-81-044 CF.:jg4D February 1, 2011 <br />Permittee: BTU Empire Corporation <br />Street: 29515 RCR27 FEB 0 3 ?zol, <br />-50n, <br />City: Oak Creek Division u, ' <br />Wining and bale* <br />State: Colorado Zip Code: 80477 <br />Brief Description of Revision: Change in Owner/Mine Name (MR10-49) <br />Public Notice Attached: Yes _ No X (Required for PRs and TRs) <br />Bond Increase: Yes _ No X Federal X Non-Federal Mine <br />Proposed Change in: <br />Permit Area - <br />Disturbed (+/-) 0.0 Acres <br />Permit (+/-) 0.0 Acres <br />Affected (+/-) 0.0 Acres <br />Surface Ownership - Mineral Ownership - <br />Surface Private (+/-) 0.0 Acres Mineral Private (+/-) 0.0 Acres <br />Surface Federal (+/-) 0.0 Acres Mineral Federal (+/-) 0.0 Acres <br />Surface State (+/-) 0.0 Acres Mineral State (+/-) 0.0 Acres
The URL can be used to link to this page
Your browser does not support the video tag.