Laserfiche WebLink
3. In question 22(d) of the Division's 10 May 2010 Midterm Review of the Colowyo <br />Mine the Division requested that Colowyo provide a description of the topsoil <br />salvage and replacement activities that would occur in conjunction with the rill <br />and gully repair. This description may contain several parts, depending on the <br />size of the rills and gullies encountered. The salvaging and replacing of topsoil in <br />these areas is critical to protecting the topsoil resource. Please include a <br />description of the topsoil salvaging and replacement activities that will occur <br />in conjunction with the annual rill and gully repair. <br />This concludes the Division's preliminary adequacy review for the Colowyo Mine's <br />Minor Revision 106. The proposed decision date for this revision is 7 February 2011. <br />Colowyo's prompt response to this adequacy letter will ensure meeting this date. Please <br />call me at (303)866-3456 X8145 if you have any questions. <br />Sincerely, <br />James R. Stark <br />Environmental Protection Specialist <br />cc: Sandy Brown <br />Kurtis Blunt