My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-02-01_REVISION - P2008043
DRMS
>
Day Forward
>
Revision
>
Prospect
>
P2008043
>
2011-02-01_REVISION - P2008043
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:41:11 PM
Creation date
2/2/2011 12:16:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2008043
IBM Index Class Name
REVISION
Doc Date
2/1/2011
Doc Name
Surety Reduction Approval
From
DRMS
To
Powertech (USA) Inc.
Type & Sequence
SR2
Email Name
DB2
MR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task #: EXC _ <br />Date : 01/18/2011 <br />User : DB2 <br />State : Colorado Permitljjob #: P-2008-043 <br />County : Weld Abbreviation : none <br />Site : Centennial Project Filename : P043-EXC <br />Agency or organization name : DBMS <br />Permit or other job action : Revised reclamation costs under SR-2 <br />Task description : Backfill and replace topsoil in mud <br />HOURLY EQUIPMENT COST <br />Machine description : Cat 311 C U Horsepower : _ 79 <br /> Weight (MT) : 11.94 <br /> <br />Cost Breakdown : <br />Utilization % _ <br />Ownership cost/hour : $17.82 NA Shift basis : 1 per day <br />Operating cost/hour : $20.51 100 Data source : (CRG) <br />Operator cost/hour : $38.72 NA <br />Total unit cost/hour : $77.05 Total fleet cost/hour : $77.05 <br /> <br />.....:....::::.:...::::,:::.:.::::.::..:..:......... <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 17 BCY factor : 1.250 volume : 21 LCY <br /> <br />Source of estimated volume: 1 pit @ 5'x 15'x 6' <br />Source of estimated swell factor : Swell table, earth dry packed <br /> <br />HOURLY PRODUCTION <br />Excavator Cycle Time (load bucket, swing loaded, dump bucket. swing emote) <br />Basic job condition description : SEVERE <br />Secondary job condition within basic description : SEVERE <br />Cycle time value : 0.33 minutes <br />Bucket Capacity <br />Rated bucket capacity : 0.68 LCY (heaped) Bucket size class : medium <br />Bucket fill factor : 0.50 USER-PROVIDED BUCKET FILL FACTOR <br />Adjusted bucket capacity : 0.34 LCY <br />Job Condition Correction Factors Source <br />Site altitude : 5,000 feet Altitude adjustment : 1.00 _ (Cat HB_) _ <br />Job efficiency adjustment : 0.83 (1 shift/day) <br />Net job correction : 0.83 multiplier
The URL can be used to link to this page
Your browser does not support the video tag.