Laserfiche WebLink
CIRCES Cost Estimatina Software <br />PROJECT IDENTIFICATION sheet 1 of 2 <br />Agency or organization name : DRMS <br />Task #: MOB State : Colorado Permitljjob #: P-2008-043 <br />Date : 01/18/2011 County : Weld Abbreviation : none <br />User : DB2 Site :Centennial Project Filename : P043-MOB <br />Permit or other job action :Revised Reclamation Costs Under Sr-2 - <br />Task description : Mobe / Demobe <br /> <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br />Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour : $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />Machine Weightlunit Ownership Haul Rig Fleet Size Haul Trip Return Trip DOT permit <br />Description (Tons) Costfhr/unit Cost/hr/unit (No. units) Cost/hr/fleet Cost/hr/fleet Cost/fleet <br />-Cat 311C U 13.16 $17.82 $88.67 1 $106.49 $88.67 $0.00 <br />_.$0.00 <br />Subtotals : $106.49 $88.67