Laserfiche WebLink
6 (FORM 2 - Public filing) <br />8. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re-establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />. t? <br />OV1 • <br />9. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />10. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br /> <br />11. Describe how roads will be reclaimed or returned to their pre-prospecting (or better) condition: <br />VI HO1 w;II bL ALvk-na'4 1 QCtorAAt-e_L W,1+11 t'uie- 5% <br />Y?O V'O f t34ei, 1 ,-,J-W L r 41-j. TC-jP to <br />W It ? T I Its( a1 r4t, P0'4I ay t C t' ?e - C'o i.&V-C hC : W