Laserfiche WebLink
• <br />Minerals and Geology to use this area as a reference area. They will review our site proposal and <br />hopefully grant our request as well. With yours and the Divisions approval, New Horizon Mine is <br />anticipating conducting a vegetation study this September in the airport reference area. This study <br />will assist us in getting partial Reclamation Bond Release in the Second Park reclamation area. <br />Thank you for your time and consideration. Please cal me if you have further questions.' <br />Sincerely, <br />C/ <br />Ross L. Gubka, P.E. <br />Chief Engineer <br />Name Date <br />Page 2 of 2 <br />• (Revised 1- 15 -03) Attachment 2.05.4(2)(e) -4 -5 <br />