My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-01-31_ENFORCEMENT - C1981008
DRMS
>
Day Forward
>
Enforcement
>
Coal
>
C1981008
>
2011-01-31_ENFORCEMENT - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:29:35 PM
Creation date
2/1/2011 10:32:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
ENFORCEMENT
Doc Date
1/31/2011
Doc Name
DRMS Response to TDN
From
DRMS
To
Christine Belka OSM
Violation No.
TDNX11140182002
Email Name
DAB
MLT
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
New Horizon Mine, C- 1981 -008 <br />Ten Day Notice #X11 - 140 - 182 -002 <br />January 31, 2011 <br />Page 6 <br />reclamation plan, WFC is committed to replacing all of the Morgan property to cropland - <br />irrigated alfalfa hay. The approved reclamation plan will restore the property to conditions <br />capable of supporting the post mining land use as documented in the PR6 findings, Section A., <br />Number 13. <br />Number 13. in Section A of the PR6 findings (page 25) makes a finding of compliance with Rule <br />4.16. <br />11. Please refer to the summary of Prime Farmland Determination in the PR6 findings, Section II. E1 <br />on page 16. Additional information is provided in the Divison's response to TDN X10- 140 -182- <br />003. <br />The Division finds no violation of Rule 2.04.12(1). <br />12. As discussed in alleged violation number 7, an Order 1 Soil Survey was conducted in 1998 for the <br />PR5 expansion area at the New Horizon Mine. This survey included the Morgan property. The <br />National Soil Survey Handbook was used for reference in the final report prepared by Jim Irvine <br />of Intermountain Resources Inc. <br />The Division finds no violation of Rule 2.06.6(2). <br />13. Topsoil preparation and Reconditioning for the reclaimed cropland, including fertilization, is <br />discussed in Section B, IV. D. of the PR6 findings (pages 46 -47). <br />The Division finds no violation of Rule 4.25.5(2). <br />It is the Division's finding that the alleged violations do not exist. <br />Please contact me if you have additional questions. <br />Sincerelyi <br />Davi A. Berry <br />Director, Office of Mined Land Reclamation <br />C. Mr. Lance Wade, New Horizon Mine Manager <br />Attachments <br />1. Proposed Decision and Findings of Compliance for the New Horizon Mine, C -1981 -008, <br />Permit Revision No. 6 <br />2. Mined Land Reclamation Board Order, December 12, 2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.