My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-01-25_REVISION - C1992080
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1992080
>
2011-01-25_REVISION - C1992080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:29:24 PM
Creation date
1/31/2011 1:31:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992080
IBM Index Class Name
REVISION
Doc Date
1/25/2011
Doc Name
Midterm Review Findings & Cost Estimate
From
DRMS
To
Savage & Savage Environmental
Type & Sequence
MT4
Email Name
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Task # : 23b <br />Date : 0910112010 <br />User: TAK <br />Permit/job #: C-92-080 <br />Abbreviation :none <br />Filename :C080-23b <br />Agency or organization name: CDRMS <br />Permit or other job action :Midterm Review 4 <br />Task description : Excavate C.J. Canyon channel - easy digging section <br />HOURLY EQUIPMENT COST <br />Machine description : Cat 330C L Horsepower : 244 <br />Weight (MT) : 33.72 <br />Cost Breakdown : <br />Ownership cost/hour : <br />Operating cost/hour : <br />Operator cost/hour : <br />Total unit cost/hour : <br />MATERIAL QUANTITIES <br />Initial <br />volume : 3,992 CCY <br />Utilization <br />$43.39 NA <br />$73.00 100 <br />$38.72 NA <br />$155.11 <br />Swell <br />factor : 1.125 <br />Shiftbasis : 1 per day <br />Data source : (CRG) <br />Total fleet cost/hour : $155.11 <br />Loose <br />volume : 4,491 LCY <br />Source of estimated volume : Reclamation plan, page 5-25 <br />Source of estimated swell factor : CDRMS estimate <br />HOURLY PRODUCTION <br />Excavator Cycle Time (load bucket, swing loaded dump bucket, swing empty) <br />Basic job condition description <br />Secondary job condition within basic description <br />Cycle time value <br />Bucket Capacity <br />Rated bucket capacity <br />Bucket fill factor <br />Adjusted bucket capacity <br />2.25 LCY (heaped) Bucket size class <br />0.45 Rock - Poorly blasted (40% - 50%) <br />1.01 LCY <br />Job Condition Correction Factors <br />Site altitude : <br />CIRCES Cost Estimating Software <br />HYDRAULIC EXCAVATOR WORK <br />State : Colorado <br />County :La Plata <br />Site : Carbon Junction Mine <br />AVERAGE <br />AVERAGE <br />0.32 minutes <br />medium <br />Source <br />6,920 feet Altitude adjustment : 1.00 (Cat HB) <br />Job efficiency adjustment : 0.83 (1 shift/day) <br />Net job correction : 0.83 multiplier <br />Unadjusted hourly unit production <br />Adjusted hourly unit production <br />Adjusted hourly fleet production <br />JOB TIME AND COST <br />Fleet size : 1 excavator(s) <br />Unit cost : $0.987 per LCY <br />189.25 LCY/hour <br />157.08 LCY/hour <br />157.08 LCY/hour <br />Total job time <br />Total job cost <br />28.59 hours <br />$4,435
The URL can be used to link to this page
Your browser does not support the video tag.