Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name : GDRMS <br />Task # : 019 State : Colorado Permit/job # : C-92-080 <br />Date : 0912912010 County :La Plata Abbreviation :none <br />User: TAK Site : Carbon Junction Mine Filename : C080-019 <br />Permit or other job action :Midterm Review 4 <br />Task description :Haul topsoil from stockpile #2 to South Pit drill pad area <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />(Equipment Description <br />Cost Bre <br />Scraper work team -Scraper :Cat 657E w/push-pull <br />-Push dozer : NA <br />Support equipment -Load area :I IAA <br />-Dump area :NA <br />Road maintenance -Motor grader: A <br />-Water truck :N'A <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA NA NA NA NA <br />% Utilization-machine : 100 NA NA NA NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cost/hour : $113.35 NA NA NA NA NA <br />Operating cost/hour : $191.41 NA NA NA NA NA <br />Ripper op. cost/hour : NA NA NA NA NA NA <br />Operator cost/hour : $24.98 NA NA NA NA NA <br />Unit subtotals : $329.75 NA NA NA NA NA <br />Number of units 0 0 0 0 0 <br />Group subtotals : Work : $659.49 Support: $0.00 Maintenance : $0.00 <br />Total work team cost/hour : $659.49 <br />MATERIAL QUANTITIES <br />Initial Swell <br />volume : 5,647 BCY factor : 1.429 <br />Source of quantity take-off : Cost estimate in TR-12 <br />Source of estimated swell factor : PJA <br />Loose <br />volume : 8,067 LCY