My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-01-25_REVISION - C1992080
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1992080
>
2011-01-25_REVISION - C1992080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:29:24 PM
Creation date
1/31/2011 1:31:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992080
IBM Index Class Name
REVISION
Doc Date
1/25/2011
Doc Name
Midterm Review Findings & Cost Estimate
From
DRMS
To
Savage & Savage Environmental
Type & Sequence
MT4
Email Name
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Task # : 016 <br />Date : 1110312010 <br />User : TAK <br />Agency or organization name : CDRMS <br />Permit or other job action :Midterm Permit Review 4 <br />Task description :Regrade topsoil stockpile #2 <br />HOURLY EQUIPMENT COST <br />Basic machine : CAT 14H <br />Permit/job #: C-92-080 <br />Abbreviation :none <br />Filename : C080-016 <br />Horsepower: 215 <br />Attachment no. 1 :NA Shift basis : 1 per day <br />Attachment no. 2 : Multi-shank ripper <br />Data source : (CRG) <br />Cost Breakdown Ownership cost/hour : <br />Grader operating cost/hour : <br />Ripper operating cost/hour : <br />Operator cost/hour : <br />Total unit cost/hour : <br />Utilization % <br />$45.35 NA <br />$58.93 100 <br />$0.00 0 <br />$24.50 NA <br />$128.78 Total fleet cost/hour <br />MATERIAL QUANTITIES <br />Total area to be graded or ripped : 2.69 acres <br />Source of estimated acreage : Page 5-1 of reclamation plan <br />HOURLY PRODUCTION <br />$128.78 <br />Selected application :Finish grading (0-2.5 mph) <br />Average grader speed : 1.25 mph <br />Selected blade angle : 30 degrees " • at 0 degrees, blade is perpendicular <br />Effective blade length : 12.10 feet to direction of travel. <br />Width of blade overlap per pass : 2.00 feet <br />Net grading or ripping width per pass : 10.10 feet width of ripper beam on ripping applications <br />Unadjusted hourly unit production : 1.5303 acres/hour <br /> <br />Job Condition Correction Factors Source <br />Average site altitude : 7,000 feet Altitude adjustment factor : 1.00 (Cat HB) <br /> Job efficiency adjustment factor : 0.90 (1 sh/d, fav.) <br /> Net job correction : 0.9000 multiplier <br />Adjusted hourly unit production : 1.3773 acres/hour <br />Adjusted hourly fleet production : 1.3773 acres/hour <br />JOB TIME AND COST <br />Fleet size : 1 grader(s) Total job time <br />Unit cost : $93.50 per acre Total job cost <br />CIRC:ES Cost Estimating Software <br />MOTOR GRADER WORK <br />State : Colorado <br />County :La Plata <br />Site : Carbon Junction Mine <br />1.95 hours <br />$252
The URL can be used to link to this page
Your browser does not support the video tag.